What We Do

Services

Full breakdown of what we build, replace, and repair, and what each one actually involves.

Home › Services

Everything we take on

Every job below is one we do ourselves across National City.

Deck Installation

We dig and pour concrete footings below grade, set posts, and frame with pressure-treated joists before the decking goes down. Every ledger board gets lag-bolted to the house rim joist and flashed, since that's where most new decks fail first if it's skipped.

Custom Deck Design

We'll sketch the layout with you, including stair placement, railing style and whether it ties into an existing patio or roofline. Multi-level designs and built-in bench seating add framing complexity, so we price those out before any lumber is ordered.

Deck Replacement

When the frame underneath is rotted past saving, we tear the whole deck down to the footings and rebuild rather than deck over a bad frame. We'll tell you honestly if your footings are reusable or if they need to come out too.

Deck Repair

Soft boards, popped nails, a wobbly railing, a splitting stair stringer, we fix all of it without necessarily rebuilding the whole structure. Sometimes a repair is a few boards and new hardware, sometimes it turns into more once we're under the deck and see the joists.

Composite Decking Installation

Composite boards like Trex or TimberTech don't splinter or need restaining, which matters if you're not planning to spend a weekend every other summer on upkeep. We still frame underneath with real lumber or treated joists, spaced tighter than code minimum so the boards don't bounce.

Deck Staining & Sealing

We pressure wash, let the wood dry out for a couple of days, then apply a penetrating stain or clear sealer depending on what you want the grain to look like. Skip this every year or two in full sun and the boards gray out and start checking.

Deck Railing Repair & Installation

Loose balusters, wobbly posts and rails that don't meet the 4-inch sphere spacing code all get fixed or replaced. We re-set posts into the frame with structural screws, not just toe-nailed, so the railing doesn't work loose again in a season.

Multi-Level Deck Construction

Stepped decks need stair stringers cut to the right rise and run at each level, and the framing has to carry more point load where one level ties into another. We engineer the connections so the lower deck isn't just hanging off the upper one's rim joist.

Pergolas & Deck Covers

A pergola or shade cover over an existing deck means tying new posts into the deck frame without weakening it, which usually means sistering joists or adding blocking underneath. We check what the current frame can actually carry before adding weight on top of it.

Fence Installation

We also build wood and vinyl fencing, since a lot of deck jobs come with a fence that needs replacing at the same time. Post spacing and depth matter more than people think, especially in clay soil that shifts with the rain.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across National City, CA

Deck construction and repair work covers these cities and the areas between them.

National City, CA
San Diego, CA
Chula Vista, CA
Oceanside, CA
Escondido, CA
El Cajon, CA
Carlsbad, CA
Vista, CA
San Marcos, CA
La Mesa, CA
Imperial Beach, CA
Coronado, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
A permit is usually required in San Diego County for any deck attached to the house or built more than 30 inches above grade. Low, detached ground-level decks sometimes skip the requirement, but it depends on the exact height and footprint, so it's worth checking first.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from footings to final board, weather and inspections permitting. Multi-level decks or ones carrying a pergola on top take longer, often three to four weeks.
Can you build a deck to fit a tight budget?
Pressure-treated lumber costs significantly less than composite decking, and a simpler rectangular layout without stairs or multiple levels cuts labor time too. Being upfront about the budget early lets the design get adjusted before materials are ordered, rather than cutting corners mid-project.
What kind of guarantee comes with the work?
Workmanship should be covered for a set period after completion, spelled out in writing in the quote before work starts. Material warranties, like a composite deck board's fade and stain warranty, come separately from the manufacturer.
Who will I actually be dealing with during the project?
The same crew that frames the deck handles the decking, railing, and finish work, rather than handing the job to different subcontractors at each stage. Day-to-day questions go to whoever's running the job site, not a separate office contact.
What materials do you use for decking?
Pressure-treated lumber, cedar, and composite brands like Trex or TimberTech are the main options, each with different costs and different upkeep over time. Composite skips the annual staining but costs more upfront, while wood needs resealing every year or two to hold up in full sun.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, though the immediate work area gets fenced off or blocked with saw horses for safety. Access to the house through the work zone may be limited for a day or two during framing and decking.
What should I do to prepare the site before you arrive?
Clearing furniture, planters, and grills off the existing deck or the build area makes the first day go faster. Trimming back plants or sprinkler heads near the footing locations also helps, since those sometimes have to move.
What if you find rot or damage once the old deck comes down?
Hidden rot in ledger boards, joists, or posts gets flagged before new decking goes on top of it, since covering it up just hides the problem for a future owner. That usually means a change order for the extra lumber and labor, priced before work continues.
How do I maintain a new deck once it's finished?
Wood decks need a wash and resealing roughly every one to two years, depending on sun exposure, to keep water from working into the grain. Composite decking mostly just wants a wash now and then to clear debris from between the boards, since it doesn't absorb water the way wood does.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (619) 361-7413